|
| |
T-28 Participation in the Convection and Precipitation/Electrification(CaPE)
experiment
| Overview | Flights | Reports |
Overview
From July 8 - Aug 18, 1991, the T-28 participated in the Convection and Precipitation/Electrification
field project in east central Florida. The experiments focused on five objectives:
- Identification of the relationships among co-evolving wind, water, and electric fields within
convective clouds.
- Determination of the meteorological and electrical conditions in which natural and triggered
lightning can (and cannot) occur, and understanding its initiation and propagation.
- Development of mesoscale numerical forecasts (2-12 hr) of wind, clouds, and thunderstorms.
- Improving techniques for performing short-period forecasts (nowcasts, < 2 hr) of convection
initiation, downbursts, and tornadoes.
- The characterization of precipitation particles and remote estimation of rainfall.
The T-28 flew to support the multiparameter radar studies and investigations of the microphysical
and electrical structure of thunderstorms, into regions of the storm where conditions precluded
other research aircraft. The T-28 was also available to supply in-situ measurements in clouds
being scanned from above by various prototype remote sensing instruments.
The standard package of instruments provided for the
determination of temperature, vertical wind, electric fields, water content, etc. During CaPE the
T-28 carried a PMS 2D-P optical probe.
Flights
- Flight 556 - 7/11/91 09:50 - 11:30
- Flight 557 - 7/11/91 16:05 - 18:10
- Flight 558 - 7/12/91 14:00 - 16:25
- Flight 559 - 7/14/91 16:45 - 19:10
- Flight 560 - 7/16/91 15:15 - 17:35
- Flight 561 - 7/18/91 14:55 - 16:55
- Flight 562 - 7/19/91 13:35 - 16:00
- Flight 563 - 7/20/91 10:10 - 12:00
- Flight 564 - 7/28/91 15:35 - 17:35
- Flight 565 - 7/29/91 16:55 - 19:10
- Flight 566 - 7/31/91 12:50 - 14:45
- Flight 567 - 8/02/91 16:10 - 18:30
- Flight 568 - 8/03/91 16:30 - 18:30
- Flight 569 - 8/06/91 15:10 - 16:55
- Flight 570 - 8/07/91 13:35 - 15:50
- Flight 571 - 8/08/91 12:45 - 14:55
- Flight 572 - 8/09/91 13:30 - 15:55
- Flight 573 - 8/11/91 15:45 - 18:00
- Flight 574 - 8/13/91 15:10 - 17:40
- Flight 575 - 8/15/91 16:30 - 18:40
- Flight 576 - 8/18/91 15:00 - 16:50
Reports
For a summary of the T-28 participation in the CaPE field project, request
Report SDSMT/IAS/R-92/04.
.
Institute of Atmospheric Sciences
South Dakota School of Mines and Technology
501 E. St. Joseph Street
Rapid City, SD 57701-3995
(605)394-2291
|